Clibbies
Calm-ish and Behind Schedule Storage Clipboard - white

Clibbies original

Calm-ish and Behind Schedule

$24.99

A4 hard-shell storage clipboard with the design printed on the back panel. Stores paperwork inside; low-profile metal clip on the front. Size: 240mm × 340mm (9.4" × 13.3"), 2.3mm plastic plate.

Clipboard color
Made for the shiftStorage for papers and essentials
Design on the backYour work surface stays clear